桥梁钢结构圆柱头焊钉焊接常见质量问题及解决措施

Common quality problems and technical measures of stud welding for steel bridge structures

  • 摘要: 螺柱焊接在桥梁钢结构制作过程中应用广泛,但桥梁钢结构圆柱头焊钉的焊接一直采用人工螺柱焊接,不仅焊接环境恶劣,焊工劳动强度大,而且焊接生产效率低,焊接质量不稳定。随着人工智能的不断发展,研发创新的不断投入,圆柱头焊钉焊接生产的自动化程度越来越高,焊接质量稳定性和焊接生产效率进一步提高。但无论人工螺柱焊接,还是智能化焊接,圆柱头焊钉的焊接仍然存在一些焊接缺陷和焊接质量问题。介绍了圆柱头焊钉的质量标准,总结了圆柱头焊钉人工螺柱焊接和机器人焊接两种焊接方法在焊接试验和焊接生产过程中出现的共性焊接缺陷和焊接质量问题,查找分析了产生的原因,并提出了修补工艺和质量保证工艺措施,希望在桥梁钢结构制造中进一步提高圆柱头焊钉的焊接智能化程度及焊接生产效率,进一步加强圆柱头焊钉的焊接质量管理。

     

    Abstract: Stud welding is widely used in the production of steel bridge structure. However, the stud welding has been using manual welding for a long time, which short comings are worse welding environment for welder and operator around, larger labor intensity for welding operator, lower efficiency of welding production, and more unstable in welding quality. With the continuous development of artificial intelligence and huge investment of innovation, the automation of stud welding production is increasing sharply, and the welding quality stability and welding production efficiency are further improved. But whether manual stud welding or intelligent stud welding,the stud welding still has some welding defects and welding quality problems during the welding test and and the welding production. It introduces quality standard of stud welding, summarizes the common welding defects and welding quality problems during the welding test and the welding production, finds and analyzes the causes,and proposes the repair process and quality assurance measures, hoping to further improve the degree of welding intelligence and welding production efficiency, and further strengthen the welding quality management of stud welding during the manufacturing of steel bridge structure.

     

/

返回文章
返回